Home White Papers IT and Software Experiences of Systems Integration Management on Rail Transit Projects
This whitepaper looks at the Singapore Land Transport Authority's (LTA) systems integration management process for the design and construction of rail transit projects in the country. The process covers the entire project stage from start to finish for revenue operation, which is subdivided and mapped into well-designed project phases.
This paper addresses the strategies adopted to manage interface design and system integration as well as various pragmatic management methods from LTA's implementation experiences and the main system interface / integration problems encountered and subsequent solution developments.
The major focus areas include overall systems integration / design, interface and integration management, integrated system testing and commissioning, requirements traceability and management as well as configuration management.
Available Downloads