Cologne Light Rail Modernisation, Germany

Email-Icon
 
Print-Icon
 
Link-to-us
 
Related Projects
key facts
Key Data
Population
986,000
Operator
Kölner-Verkehrs Betreibe (KVB) – Cologne Transport
Date opened
1968
Routes
15 (11 Stadtbahn / light rail, 4 tramway)
Platform height
350mm and 900mm
Route length
191km (119 miles)
Number of stations
Stadtbahn - 48

Germany’s fourth most populous city, Köln (Cologne), 200km north of Frankfurt, is cut in two by the River Rhine with rail and light rail routes crossing by a series of bridges. Köln is a major international business centre, having its traffic-generating Messe (trade fair site) unusually close to the city centre.

Encouraged by a new rail link to the city by DB ICE, regional and S-Bahn services, Köln-Bonn Airport has expanded rapidly as a hub for low cost carriers.

In the early 1960s, a decision was made to integrate and develop a collection of tramways previously under various ownerships, moreover it was decided not to create a separate metro rail system for the city.

Supplementing the Rhine-Ruhr region’s extensive heavy rail coverage, Kölner Verkehrs- Betriebe AG (KVB) now operates the second largest tramway and light rail system in Germany with a track length of over 190km (118 miles), all part of the Verkehrsverbund Rhein-Sieg (VRS) for ticketing purposes.

THE PROJECT

Modernisation of such an extensive tram network has been ongoing, having first begun in 1956. During the 1960s, the city's articulated trams benefitted from large-scale investment, and the pace of modernisation has remained fast ever since. City tram routes and interurban routes were amalgamated in 1968, and the vast, 15-route tram system upgraded.

"Kölner Verkehrs- Betriebe AG now operates the second largest tramway and light rail system in Germany with a track length of over 190km."

Among the major works carried out at this time was the transfer underground of the city centre tram routes, mainly using cut and cover along main thoroughfares. By 2001 KVB had achieved a 69% cost recovery rate. Köln, long notorious for its road congestion, has approximately 90% of residents using the KVB system, a situation that encouraged continuing public transport development.

Capacity on the two cross-city tunnels had been at saturation point for some years, so the beginning of work on a third main tunnel under the city centre was a much-needed step. This new, 3.3km tunnel, projected to cost €600m, is being funded through a 90% subsidy from the Nordrhein Westphalen government.

Significant development dates have been: 27 May 2000 – Line 1 extended underground (500m) at its eastern end to Bensberg; 15 June 2002 – Line 1 Junkersdorf – Weiden-Schulstrasse (2.7km) and Line 3 Bocklemünd – Mengenich-Ollenhauerring; 16 June 2003 – Line 4 rebuilt to Stadtbahn standard between Keupstrasse and Odenthaler Strasse; May 2006 – Line 1 Weiden-Schulstrasse-Weiden West (1km).

INFRASTRUCTURE

The inner city subway comprises a coherent network of 34km of tracks, fed by 35 city bus routes. This has given Köln an integrated and reliable complete transport system at a lower cost than providing a complete heavy metro network.

Eight tram routes have been upgraded to light rail standards in the programme begun in the 1970s. These all have 900mm-high station platforms and use tunnels and/or surface tracks laid on reserved alignments.

However, during the 1980s, it became evident that it would not be viable to convert the furthest outlying lines to these Stadtbahn specifications, or, in the case of Lines six and twelve, that the lines had curves which were too sharp for Stadtbahn operation.

Irrespective of high or low floor, the service is variously referred to in the area as Strassenbahn (tramway), Stadtbahn (city railway) or even U-Bahn (underground), the latter being how routes are signed at street entrances.

The underground sections of the Amsterdamstrasse line operate on a different power system than the rest of the network. Lack of space precluded use of conventional overhead wires, and a space-saving conductor rail is incorporated in the tunnel roofs.

A novel system of operation is used on two lines which link Köln and Bonn. The 34km Route 18 is now the network' s longest line, and its third busiest, used by over 70,000 passengers per day. Each of the two cities pools a series of modern K5000 vehicles for use on these lines.

ROLLING STOCK

Historically Köln operators had been heavily involved in developing vehicles with builders, notably Düwag (later Siemens). New rolling stock orders from BN of Belgium (later Bombardier) were the first to be placed with a foreign manufacturer by a German authority, with high and low floor versions of the Flexity family eventually supplied.

Vehicles are designed to be low-cost, both in terms of construction and maintenance. Following an existing contract for 146 vehicles, KVB called up an option for 69 low-floor, bi-directional K4500s from Bombardier Transportation and Vossloh Kiepe.

The low-floor K4500 design is based on the earlier high-floor K5000 (which also have low floor capability) incorporating standard components. The new light rail vehicles have proved their worth, prompting the authorities of Stockholm, and Croydon, UK, to adopt variations of the design for their own networks.

SIGNALLING/COMMUNICATIONS

"Köln, long notorious for its road congestion, has approximately 90% of residents using the KVB system, a situation that encouraged continuing public transport development."

There is very little interchange between the old-style tram and modern Stadtbahn systems. While the original network is largely controlled under a conventional fixed block system, the vehicles on the new light rail routes are governed by a state-of-the-art central control unit.

In the event of a fault, it is displayed the driver's control unit, which also shows the action necessary to rectify it. A fault log is also stored in the system to provide background data on the fault, as well as the time and frequency of their occurrence.

The front and rear of each trainset is fitted with two LCD displays, showing clearly the line number and route information. Colour LCD displays inside the cars indicate the various stops on the route served.

THE FUTURE

By 2010 KVB anticipates its modern era Bombardier high and low floor sets will number around 300. In spite of political pressures for an all low-floor system, costs and building disruptions are likely to preclude this for the foreseeable future. Delivery of new vehicles will maintain a supply of former Köln rolling stock to other operators.

A 3.9km (2.4 mile) long north-south tunnel is under construction from Breslauer Platz(Hauptbahnhof) to Bonntor via Heumarkt, Severinstrasse and Chlodwigplatz, with the new Rathaus station bringing the tourist hotspot of the Altstadt onto the network. KVB has maintained a high public relations profile on this development, with a 2011 opening date now expected.

The history of Köln’s light rail network suggests that extensions and upgrades will remain a feature of the system.



Expand Image Expand Image
City tram routes and interurban routes were amalgamated in 1968, and the vast, 15-route tram system was upgraded.



Expand Image Expand Image
The new vehicles have been designated the 4000 series. The interior of a 4000 series light rail vehicle.



Expand Image Expand Image
The 5000 series light rail vehicle has low floors for two thirds of its length.



Expand Image Expand Image
The interior of the 5000 series.



Expand Image Expand Image
The 5000 series boast the latest technology in door systems.



Expand Image Expand Image
Most central routes have been relocated just below the surface: the two-level Friesenplatz station.



Expand Image Expand Image
U-Bahn signage is found elsewhere in Germany to denote true metro operations.



Expand Image Expand Image
High-floor trams at Neumarkt, one of the few surface sections in the central area.



Expand Image Expand Image
252 low-floor Bombardier Flexity Swifts have been delivered to KVB.



Expand Image Expand Image
Multiple routes at stations call for comprehensive service information.



Expand Image Expand Image
Just north of the Hauptbahnhof, construction works for the new north-south line.



Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  

Suppliers
Faiveley TransportHÜBNERMTM Powernora systemsRhomberg BahntechnikSaargummiSchrey & VeitTSTG Schienen TechnikVoith Turbo

Newsletter Sign-Up
For all the latest news in the rail industry, sign up here

Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Industry News
Gallery
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the railway industry