Key Data:
Train operator
Renfe Operadora
Date inaugurated
April 1992
Route length
Madrid-Seville - 470km; Madrid-Barcelona - 550km
Maximum line speed
350km/h (220mph)
Power supply
25kV ac overhead supply
Rolling Stock:
AVE S-102
Patentes Talgo/Bombardier Transportation (46 ordered)
AVE S-103
Siemens Mobility (26 ordered)
Special Characteristics:
System at different gauge to main rail system
Ambitious nationwide project to 2020
Inter-city journey times slashed
330km/h trains from several suppliers
State-of-the-art signalling and control systems
Connection with European high-speed network due in 2009