Key Data:
Operator
Chinese Ministry of Railways
Maximum Line Speed
300km/h (186mph)
Number of Staff
1.9 million
Estimated Cost
Around ¥160bn
Rolling Stock:
Number of Vehicles
not yet finalised
Capacity
not yet finalised
Special Characteristics:
Template for future high-speed network in China
Area served produces 40% of national wealth
Completion creates capacity for slower passenger and freight services on existing routes
Incorporates western technology draws
Line will be engineered for 350km/h maximum speeds
Major new crossings of the yellow and Yangtse rivers