Key Data:
Construction Completed
September 2009
System:
Infrastructure manager
ProRail
Route lengths
Amsterdam-Schiphol: 17 km
Rotterdam CS-R. Lombardijen: 7 km
R. Lombardijen- start high-speed track: 5 km
HS track-Belgian border: 43 km
Maximum line speed
300km/h (185mph)
Power Supply
25kV ac overhead
Rolling Stock:
Supplier
Ansaldobreda, S.P.A.
Formations
2 power cars, 8 trailers
Special Characteristics:
Internal and international high speed services
Different power supply to national system
European Rail Traffic Management System (ERTMS)
Unique U-shaped trackbed design reduces noise and enhances safety
Design heavily influenced by environmental factors
Features major engineering structures