Magdalene to Provide Eurotunnel with a Keymile Transmission System Replacement Solution

 

17 September 2009

Magdalene has signed a contract with Eurotunnel Group to design, model, pilot and supply a replacement telecommunication solution for the Channel Tunnel connecting England and France. Magdalene will also be providing implementation assistance, training and long-term support services to Eurotunnel for the transition to and maintenance of the new telecommunications infrastructure.

The project scope provides the replacement of existing PDH transmission system equipment with a Keymile multi-service UMUX solution and associated management system. The initial stage will be to design the replacement solution, followed by a modelling and pilot phase with subsequent deployment of around 60 multiplexer nodes. The networks at the landside terminals in Folkestone (UK) and Coquelles (France) will be updated with infrastructure offering SDH capability and a migration path to packet-based services for the potential of more extensive deployment and utilisation.

The Channel Tunnel, opened in 1994, is the longest undersea tunnel in the world. The section under the sea is 38km long. The three tunnels (two single-direction single-rail and a service tunnel), each 50km long, were bored at an average 40m below the sea bed, and link Folkestone in Kent to Coquelles in Pas-de-Calais.


Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  


Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Industry News
Gallery
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the railway industry