System:
Location
Santa Cruz de Tenerife
Developer
Metropolitano de Tenerife
Route length
12.3km (7.6 miles)
Rolling Stock:
Traction package
6x 120kW motors
Maximum speed
60km/h (operational: 21km/h)
Power
750v dc overhead supply
Special Characteristics:
Dedicated wind farm to provide clean electricity
First modern rail system in Canary Islands
Line 2 projected to open in 2009
Energy saving braking system incorporated
Steeply graded line climbs 600m on 12km route