Tenerife Light Rail System, Canary Islands

 

System:

Location
Santa Cruz de Tenerife
Population
223,347 (2005)
Developer
Metropolitano de Tenerife
Project cost
€306m
Opening date
June 2007
Route length
12.3km (7.6 miles)
Gauge
1,435mm
Lines
1 (2 from 2009)

Rolling Stock:

Vehicle total
20
Builder
Alstom, Barcelona
Vehicle type
Citadis 302
Traction package
6x 120kW motors
Capacity
200 (60 seated)
Maximum speed
60km/h (operational: 21km/h)
Power
750v dc overhead supply

Special Characteristics:

Dedicated wind farm to provide clean electricity
First modern rail system in Canary Islands
Line 2 projected to open in 2009
Energy saving braking system incorporated
Steeply graded line climbs 600m on 12km route


Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Industry News
Gallery
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the railway industry