Key Data:
Project Type
Construction of Freight Railway
Operator
The Abu Dhabi National Oil Company (Adnoc)
Route
Shah gas fields-Habshan- Ruwais port
Speed
Freight trains- top speed 120km/h and Passenger trains-top speed of 200km/h
Scheduled Construction
End of 2010
Freight Capacity
Shah-Habshan:10,000t of granulated sulphur a day Habshan-Ruwais: 20,000t of processed sulphur a day.
Rolling Stock
10 diesel locomotives and 250 covered hopper wagons
The project will be contributing to increasing the UAE's sulphur production from 1.7m tons to 7m tons a day