Key Data:
Opening date
2011 (planned)
Route length
425km split into three sections:
Maximum line speed
320km/h
Electrification:
Rolling Stock:
Builder
Alstom, Francorail-MTE, de Dietrich
Electrical equipment
Alstom
Trainset power
6,300kW to 9,000kW
Special Characteristics:
First phase of new project will massive reduce journey times between France and Switzerland, France and Spain and France and Germany
Construction began in June 2006 with a 2011 opening date scheduled
Finance has come from France and Switzerland to the tune of €2.3bn
160 bridges to be built along the eastern branch
Western and southern branches at preliminary study stage
320km/h operation planned