Key Data:
Planned opening date
Unspecified
Route length
28km (17 miles)
Electrification:
Rolling Stock:
Special Characteristics:
ВЈ500 million-plus, three-line system
Government refused in 2005 to sanction project
Designed to ease acute road traffic congestion
Most of route on segregated alignment
Guided bus option being explored in short term