Key Data:
Project Sponsor
Transport for London
Key Supporter
Cross River Partnership
Route Length
16.5km (10.25 miles)
Passenger Volume
7,000 each way/hour (peak)
Principle Heavy Rail Connections
5
Underground Connections
12
Vehicle Supplier / Numbers
tbc
Power Supply (Probable)
750v dc overhead
Special Characteristics:
Return of trams to central London after over 60 years
Croydon Tramlink used to support the case
High-capacity vehicles at two-minute intervals
Varied levels of support for the scheme
Original plan may be split into two projects