Brenner Base Rail Tunnel, Austria

 

Key Data:

Location
Austria
Connected routes
Innsbruck (Austria) to Fortezza (Italy)
Estimated cost
€6bn
Length
56km (35 miles)
Maximum speed
250km/h
Approved
2009
Construction begins
2011
Completion
2025
Minimum radius
1,270
Operating speed for goods trains
100-120km/h
Construction phase
2010-20
Control and command system
ETCS Level 2
Length from the Innsbruck bypass to Fortezza
62.7km
Longitudinal grade
4-6.7%
Tunnel length
56km (35 miles)
Lines
Two Alphie rail lines
Power
25kV 50Hz overhead supply
Rolling stock
Haulage equipment, tunnel supply equipment and service equipment



Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features
White Papers
Jobs & Careers
Industry News
Gallery
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the railway industry