Alameda Corridor Freight Line, CA, USA

 

Key Data:

Materials Carried
Intermodal
Grain
Coal
Average Daily Traffic (2007)
50 trains/day
Traffic Target
100 trains/day

System:

Operator
UPRC
Authorised
1996
Completed
2002
Route Length
32km
Gauge
1,435mm
Principal Centres
Los Angeles/Long Beach

Extensions planned:

Nil

Electrification:

Nil

Rolling Stock:

Locomotives
3,000
Wagons
68,000

Special Characteristics:

Spectacular freight growth planned
Four old routes replaced
$2bn project
$400m federal funding
UPRC second largest US operator
Elimination of 200 level crossings